Skip to content
Journal requirements
Source-linked catalogue Sources checked 2023-06-02

Dianli xitong baohu yu kongzhi

Published by Editorial office of Power System Protection and Control

At a glance

Submission quick sheet

Peer review
Double anonymous peer review
Publication time
About 36 weeks
Author fee
Article processing charge reported
Access
Open access
License
CC BY-NC
Languages
ZH, English

Fit and scope

Use this first: a technically compliant paper can still be rejected when it falls outside the journal's remit.

Official aims and scope
Aims and scope
power system, protection and control, smart grid, renewable energy, electric vehicle, Science, Technology: Electrical engineering. Electronics. Nuclear engineering: Distribution or transmission of electric power, Technology: Electrical engineering. Electronics. Nuclear engineering: Applications of electric power
Subjects
power system, protection and control, smart grid, renewable energy, electric vehicle, Science, Technology: Electrical engineering. Electronics. Nuclear engineering: Distribution or transmission of electric power, Technology: Electrical engineering. Electronics. Nuclear engineering: Applications of electric power

Submission and review

The review model and timing below are catalogue facts; confirm current instructions before submitting.

Official submission information
Review model
Double anonymous peer review
Plagiarism screening
Yes
Average publication time
About 36 weeks

Evidence ledger

Check the original pages

PerfectPaper summarizes these sources for planning. The journal's current instructions remain authoritative.

Before you submit

Review the paper against the requirements—not just the formatting

Choose this journal during setup and PerfectPaper will review the paper's methods, claims, citations, figures, and fit before submission.

Start a paper review