发电技术
Published by Editorial Department of Power Generation Technology
At a glance
Submission quick sheet
Publisher and DOAJ facts can change; use the linked source for the final check.
Fit and scope
Use this first: a technically compliant paper can still be rejected when it falls outside the journal's remit.
- Aims and scope
- power generation technology, energy science, hydropower, thermal power, nuclear power, wind power, Technology: Electrical engineering. Electronics. Nuclear engineering: Applications of electric power, Technology: Electrical engineering. Electronics. Nuclear engineering: Production of electric energy or power. Powerplants. Central stations, Science
- Subjects
- power generation technology, energy science, hydropower, thermal power, nuclear power, wind power, Technology: Electrical engineering. Electronics. Nuclear engineering: Applications of electric power, Technology: Electrical engineering. Electronics. Nuclear engineering: Production of electric energy or power. Powerplants. Central stations, Science
Submission and review
The review model and timing below are catalogue facts; confirm current instructions before submitting.
- Review model
- Double anonymous peer review
- Plagiarism screening
- Yes
- Average publication time
- About 50 weeks
Evidence ledger
Check the original pages
PerfectPaper summarizes these sources for planning. The journal's current instructions remain authoritative.
Before you submit
Review the paper against the requirements—not just the formatting
Choose this journal during setup and PerfectPaper will review the paper's methods, claims, citations, figures, and fit before submission.