综合智慧能源
Published by Editorial Department of Integrated Intelligent Energy
At a glance
Submission quick sheet
Publisher and DOAJ facts can change; use the linked source for the final check.
Fit and scope
Use this first: a technically compliant paper can still be rejected when it falls outside the journal's remit.
- Aims and scope
- energy, power engineering, smart energy technologies, electric power, carbon neutrality, renewable energy, Technology: Electrical engineering. Electronics. Nuclear engineering: Applications of electric power, Technology: Electrical engineering. Electronics. Nuclear engineering: Production of electric energy or power. Powerplants. Central stations
- Subjects
- energy, power engineering, smart energy technologies, electric power, carbon neutrality, renewable energy, Technology: Electrical engineering. Electronics. Nuclear engineering: Applications of electric power, Technology: Electrical engineering. Electronics. Nuclear engineering: Production of electric energy or power. Powerplants. Central stations
Submission and review
The review model and timing below are catalogue facts; confirm current instructions before submitting.
- Review model
- Double anonymous peer review
- Plagiarism screening
- Yes
- Average publication time
- About 26 weeks
Evidence ledger
Check the original pages
PerfectPaper summarizes these sources for planning. The journal's current instructions remain authoritative.
Before you submit
Review the paper against the requirements—not just the formatting
Choose this journal during setup and PerfectPaper will review the paper's methods, claims, citations, figures, and fit before submission.