人民黄河
Published by Editorial Office of Yellow River
At a glance
Submission quick sheet
Publisher and DOAJ facts can change; use the linked source for the final check.
Fit and scope
Use this first: a technically compliant paper can still be rejected when it falls outside the journal's remit.
- Aims and scope
- yellow river, water conservancy, water management, water resources, water environment, water engineering, Technology: Hydraulic engineering: River protective works. Regulation. Flood control, Technology: Hydraulic engineering: River, lake, and water-supply engineering (General)
- Subjects
- yellow river, water conservancy, water management, water resources, water environment, water engineering, Technology: Hydraulic engineering: River protective works. Regulation. Flood control, Technology: Hydraulic engineering: River, lake, and water-supply engineering (General)
Submission and review
The review model and timing below are catalogue facts; confirm current instructions before submitting.
- Review model
- Double anonymous peer review
- Plagiarism screening
- Yes
- Average publication time
- About 39 weeks
Evidence ledger
Check the original pages
PerfectPaper summarizes these sources for planning. The journal's current instructions remain authoritative.
Before you submit
Review the paper against the requirements—not just the formatting
Choose this journal during setup and PerfectPaper will review the paper's methods, claims, citations, figures, and fit before submission.