Journal of the Southern African Institute of Mining and Metallurgy
Published by The Southern African Institute of Mining and Metallurgy
At a glance
Submission quick sheet
Publisher and DOAJ facts can change; use the linked source for the final check.
Fit and scope
Use this first: a technically compliant paper can still be rejected when it falls outside the journal's remit.
- Aims and scope
- mining, metallurgy, rock mechanics, mining environment, risks in mining, mine planning and design, Technology: Mining engineering. Metallurgy
- Subjects
- mining, metallurgy, rock mechanics, mining environment, risks in mining, mine planning and design, Technology: Mining engineering. Metallurgy
Submission and review
The review model and timing below are catalogue facts; confirm current instructions before submitting.
- Review model
- Double anonymous peer review
- Plagiarism screening
- No
- Average publication time
- About 26 weeks
Evidence ledger
Check the original pages
PerfectPaper summarizes these sources for planning. The journal's current instructions remain authoritative.
Before you submit
Review the paper against the requirements—not just the formatting
Choose this journal during setup and PerfectPaper will review the paper's methods, claims, citations, figures, and fit before submission.