Przegląd Komunikacyjny
Published by SITK RP
At a glance
Submission quick sheet
Publisher and DOAJ facts can change; use the linked source for the final check.
Fit and scope
Use this first: a technically compliant paper can still be rejected when it falls outside the journal's remit.
- Aims and scope
- civil engineering, urban transport, road materials, building technology, bridge materials, railway materials, Technology: Highway engineering. Roads and pavements, Technology: Bridge engineering, Technology: Railroad engineering and operation, Technology: Building construction
- Subjects
- civil engineering, urban transport, road materials, building technology, bridge materials, railway materials, Technology: Highway engineering. Roads and pavements, Technology: Bridge engineering, Technology: Railroad engineering and operation, Technology: Building construction
Submission and review
The review model and timing below are catalogue facts; confirm current instructions before submitting.
- Review model
- Peer review
- Plagiarism screening
- Yes
- Average publication time
- About 6 weeks
Evidence ledger
Check the original pages
PerfectPaper summarizes these sources for planning. The journal's current instructions remain authoritative.
Before you submit
Review the paper against the requirements—not just the formatting
Choose this journal during setup and PerfectPaper will review the paper's methods, claims, citations, figures, and fit before submission.